Hello,
I have auto archiving set up on my suites to JASMIN but they generate 1.5TB data per day plus restart files for next cycle, and require large ancillaries (I can’t break into smaller chunks as the lead time for each crun initialisation is quite long). I need to run some tests for some 2day perturbation experiments whilst my main suite is running is it possible to increase my quota to allow this? All data is deleted every day or so once I’ve double checked the files have transferred over correctly (seems to be some failures not always caught with globus so I haven’t got an auto delete for the output files) The diskspace won’t always be in use but just occasionally if both runs coincide before I can delete the checked output! Just enough to allow me to run the 2 day tests with a bit of breathing space would be super useful.
Cheers
Helen