UM run not getting beyond coupled

Dear help,

My UM job (u-cs588) seems to be failing when it gets to ‘coupled’.
I believe it is the same as one that ran successfully before. Many thanks for any help with this, Jeremy


and from /work/n02/n02/jgrist02/cylc-run/u-cs588/log/job/19500101T0000Z/coupled/01/job.err:

Jeremy

Please rebuild with this branch revision

fcm:um.xm-br/dev/jeffcole/vn11.6_xios_full_nostash@111523

Grenville

Hi Grenville,

Many thanks, does the line you provided go in the section fcm_make_um> env> configuration file?

As in screenshot?

Cheer,

Jeremy

<img width=“1425” height=“1075” style=“width:14.8437in;height:11.1979in” id=“Picture_x0020_3” src=“//cdck-file-uploads-europe1.s3.dualstack.eu-west-1.amazonaws.com/business20/uploads/cms_support/original/1X/4d824acbcc71819a11ff64df11843ad8b0b91d3c.png” alt="Graphical user interface, application, email

Description automatically generated">

Hi Jeremy

No, not the config, change here, see attached