Hello,
Not sure if this is the right place to ask but originally First Rains had a generous CU quota with lots of plans for simulations to run, but because of a lot of technical problems and waiting for data, we never got to use most of the quota and ended up getting downgraded a lot.
In the final stretch I have finally managed to get all of the data I need and make the suites actually function and so I’m just trying to see how much I can push over the line before the end, but I fear I may run out of CUs since our budget got diminished so much. Is there any flex for reallocating CU budget at this point or would that be impossible? (just running some tests and but I should be able to give an estimate of how much would ideally be needed by tomorrow)
Thanks for your help as always!
Fran